Skip to product information
GPS Tracker Device for Car and Vehicles: Mini Hidden Magnetic no Subscription Trackers for Tracking Kids Elderly Vehicle pet - Real Time Location Track Devices no Monthly Fee for Android and iPhone
$26.67
Sale price
$26.67
Regular price
Shipping calculated at checkout.
Details
About This
- Real-Time Location Tracking with No Monthly Fees: Keep track of what matters most without any hidden costs. This GPS locator uses the SeekTag app to show your item's real-time location on your phone. There are no subscriptions and no SIM card required, making it a cost-effective tracking solution for your auto, motorcycle, truck, or trailer. You can track over a long distance with peace of mind.
- Universal Compatibility for Both iOS and Android: Whether you use an iPhone or an Android phone, this smart tracker works seamlessly for everyone. Simply download the free SeekTag application, pair the device via wireless Bluetooth connection, and you're ready to start tracking. It's the perfect personal equipment for families with mixed phone types.
- Compact, Durable Design with Multiple Attachments: Despite its powerful tracking capabilities, this device is remarkably small, tiny, and portable. The included magnetic mount securely attaches to metal surfaces, while the keychain allows for easy attachment to dog collars, kid backpacks, or luggage. With an IP65 rating, it's protected against dust and water splashes, ready for any adventure.
- Versatile Tracking for Your Valuables, Pets, and People: This isn't just for cars. Use it as a pet tracker to monitor your dogs & cats` location, a child locator for your children's safety, or an item finder for your bags and valuables. Its long range and tiny size make it an incredibly versatile tool for protecting your people and possessions from being lost.
- Reliable and Discreet for Long-Term Use: Engineered for reliability, this locator is designed for long-term use. Its efficient power management ensures a long battery life up to 360 days, providing extended tracking without frequent replacement battery. The small and undetectable design allows for discreet placement on your auto or other personal items, offering a reliable security solution.
Overview
- Brand : VVyL
- Connectivity Technology : Bluetooth
- Material : Acrylonitrile Butadiene Styrene (ABS)
- Included Components : 1 X Magnetic Case
- Battery Life : 365 days
Materials + Care
We prioritize quality in selecting the materials for our items, choosing premium fabrics and finishings that ensure durability, comfort, and timeless appeal.
Shipping + Returns
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible.